Fixed mould puller pins, stop drag-bars and nylon shutters were used to open the mould sequentially.
并用前模拉料销、限位拉杆和尼龙开闭器控制开模运动顺序,实现了浇注凝料的自动脱模。
The design of the side core-pulling delay mechanism is stated in detail, The open-close action of the mould is simulated.
本文对延时侧抽芯机构设计作了详细阐述,并模拟了模具的开合运动。
Based on the analytic results of the numerical simulation, the forming process and the mould structure for the spur-gear open-die forging were designed properly.
在数值模拟分析结果的基础上,对直齿轮的开放式成形工艺和模具结构进行了合理设计。
应用推荐